By Karl Stephens, CMCA, AMS, PCAM General Manager/COO
Phase 1 of the Dry Rack Replacement Project at Landings Harbor Marina is complete, and Phase 2 is set to begin by the end of the year.
Phase 1 included replacing one full-rack storage building and the addition of a smaller rack at the end of the aisle way. The new racks provide more uniform spaces for the boat sizes that have become more popular over the past several years. With the completion of Phase l, approximately 19 spaces were added, allowing some members to come off the waitlist for boat space.
Join Marinas Director Larry Sincoskie and me as we discuss the completion of Phase 1 and where we are headed next with this project.
Click here to watch the video.
Dateline NBC
Current and classic episodes, featuring compelling true-crime mysteries, powerful documentaries and in-depth investigations. Follow now to get the latest episodes of Dateline NBC completely free, or subscribe to Dateline Premium for ad-free listening and exclusive bonus content: DatelinePremium.com
Stuff You Should Know
If you've ever wanted to know about champagne, satanism, the Stonewall Uprising, chaos theory, LSD, El Nino, true crime and Rosa Parks, then look no further. Josh and Chuck have you covered.
Intentionally Disturbing
Join me on this podcast as I navigate the murky waters of human behavior, current events, and personal anecdotes through in-depth interviews with incredible people—all served with a generous helping of sarcasm and satire. After years as a forensic and clinical psychologist, I offer a unique interview style and a low tolerance for bullshit, quickly steering conversations toward depth and darkness. I honor the seriousness while also appreciating wit. I’m your guide through the twisted labyrinth of the human psyche, armed with dark humor and biting wit.